Scenario
brainstorm:
1.
Scenario:
Nottingham Construction Company (NCC) has won the bid to make exterior upgrades
to the GW wing. Included in the planned improvements are the removal and replacement
of the buildings’ built up roof and the installation of solar panels. As the
safety team you must create a safe work site that will allow for the staff and
students to access the building during the work day and facilitate a safe
working environment for the employees of NCC.
2.
Set
up a construction work site including barriers, signage, PPE station that
includes:
a.
An
area where an extension ladder must be safely used to access a first floor roof
b.
An
area on the roof where workers must safely complete repairs to a built up roof
c.
An
area in a commercial parking lot where work materials must be safely off loaded
d.
A
method to safely transport heavy building materials