This is a temporary site for the Construction Technology Program at Nottingham High School during the COVID-19 crisis.
Tuesday, November 22, 2016
Wednesday, November 9, 2016
Lessons for Mr. McGinty classes for Wednesday November 9, 2016
Hello: Here are the assignments for today:
Period 1: Please login to www.pltw.org and review activity 1.2.3. Make sure that you try out the circuit simulator at:
http://phet.colorado.edu/en/simulation/circuit-construction-kit-dc
Period 2: Log in to www.pltw.org and complete activity 2.4.A. Make your sketches on regular grid paper. If you are having trouble understanding what to do, go back to the glass box power point in activity 2.3 and review multi view sketching. Keep all of your work in your folder.
Period 4/5: Students should practice math skills at www.khanacademy.org.
Mr. McGinty will follow student progress. Students who work the entire class period will earn a 100%.
Period 7/8: Log in to www.pltw.org and complete activity 2.4.A. Make your sketches on regular grid paper. If you are having trouble understanding what to do, go back to the glass box power point in activity 2.3 and review multi view sketching. Keep all of your work in your folder.
Period 10 : Log in to www.pltw.org and complete activity 2.4.A. Make your sketches on regular grid paper. If you are having trouble understanding what to do, go back to the glass box power point in activity 2.3 and review multi view sketching. Keep all of your work in your folder.
Friday, November 4, 2016
IED Perspective Quiz
Directions: Click on the link for the drawing that you would like to complete. Only complete one drawing. Good Luck!
Wednesday, November 2, 2016
Thursday, September 8, 2016
Monday, June 27, 2016
Friday, June 24, 2016
Rubric rough draft for Basic Safety Module 1
Scenario
brainstorm:
1.
Scenario:
Nottingham Construction Company (NCC) has won the bid to make exterior upgrades
to the GW wing. Included in the planned improvements are the removal and replacement
of the buildings’ built up roof and the installation of solar panels. As the
safety team you must create a safe work site that will allow for the staff and
students to access the building during the work day and facilitate a safe
working environment for the employees of NCC.
2.
Set
up a construction work site including barriers, signage, PPE station that
includes:
a.
An
area where an extension ladder must be safely used to access a first floor roof
b.
An
area on the roof where workers must safely complete repairs to a built up roof
c.
An
area in a commercial parking lot where work materials must be safely off loaded
d.
A
method to safely transport heavy building materials
Subscribe to: